Your question: How does the HOPE scholarship work in Tennessee?

The HOPE Scholarship is established and funded from the net proceeds of the state lottery and awarded to entering freshmen who are enrolled at an eligible postsecondary institution within sixteen (16) months after graduating from a TN eligible high school.

How much money do you get for the HOPE scholarship in Tennessee?

Tennessee Education Lottery Scholarships (TELS) Tennessee HOPE Scholarship is a $4000 per year scholarship awarded to qualifying Tennessee residents. An additional amount of up to $2000 may be available for the summer semester for students who first received the HOPE Scholarship in Fall 2009 or thereafter.

What percentage of tuition does the HOPE Scholarship pay?

Percentage for Undergraduate Bachelor’s degree students is 85.83%* of tuition for 15 hours. Actual HOPE payments will be made on a “per credit hour” enrolled basis rate of $256.00. Percentage for Undergraduate Associate degree students is 93.68%* of tuition for 15 hours.

IT IS INTERESTING:  Does Chevening Scholarship require ielts?

Is the Hope Scholarship a full ride?

Amounts: The Zell Miller Scholarship pays the standard undergraduate tuition rate. The initial HOPE Scholarship award amount assumes the maximum amount for which you are eligible each semester. … The HOPE and Zell Miller Scholarship award amounts cannot exceed your total tuition charges for the semester.

Can you get Tennessee Promise and Hope Scholarship?

Eligible students can still receive $16,000 in Hope scholarships over four years, just as they could before Tennessee Promise was created, Krause said. … There are no academic requirements for getting a two-year Tennessee Promise scholarship, although to keep the money, students must maintain a 2.0 GPA.

Who qualifies for the HOPE scholarship in Tennessee?

GED ® recipients – the essay and optional subject area battery tests and qualifying GED ® score must minimum 21 ACT. Minimum average Revised GED ® score is 170. HiSet recipients – minimum 21 ACT exclusive of the essay and optional subject area battery tests and qualifying HiSet score. Minimum average HiSet score is 15.

How do you qualify for Tennessee promise?

Tennessee resident/U.S. citizen/eligible non-citizen/students who graduate from an eligible high School, homeschool, or earn a GED/HISET (prior to 19th birthday) can receive an award at an eligible postsecondary institution toward tuition and mandatory fees after all other gift aid has been first applied.

How much does hope pay for private colleges?

A student must also graduate with a 3.7 High School HOPE GPA and must have a score of 1200 (CR+M) on a single administration of the SAT or a 26 ACT Composite and must maintain a college cumulative GPA of a 3.3. This Scholarship will pay for 100% of tuition, including $4,000 at private colleges.

IT IS INTERESTING:  What scholarships does NMSU offer?

How many hours do you need for the HOPE Scholarship?

Students attending private colleges and universities must be enrolled at least six (6) hours to receive an award. Students who are eligible to receive HOPE as entering freshmen may receive payment through the term during which the number of attempted (not earned) credits equal at least 30 semester or 45 quarter hours.

How much is a HOPE scholarship?

For 2020-2021, the HOPE Scholarship pays a maximum of $7,680 for two semesters of enrollment in 15 HOPE eligible credits per term. Actual payment amounts for HOPE will be pro-rated down for students enrolled in fewer than 15 eligible hours.

What does GA HOPE Scholarship pay for?

The Grant provides a one-time $500 HOPE award that can be used toward tuition, books or other educational costs at an eligible college or university in Georgia.

Can you get both hope and Zell Miller?

HOPE and Zell Miller are merit based scholarship programs available to students who have met the University System of Georgia and the GSFC residency requirements and are enrolled in an undergraduate degree seeking program. Students may receive HOPE or Zell Miller, but NOT both at the same time.

Does Zell Miller cover room and board?

With HOPE and Zell Miller scholarships only covering tuition rates, there are few avenues students can take to cover housing outside of student loans. “I’m on Zell Miller right now, so the biggest thing we spend on is the room and the meal plan,” Matuszak said. “It’s the biggest thing we have to pay for.

IT IS INTERESTING:  What is the hardest scholarship to get?

What schools does TN promise cover?

Tennessee Community Colleges

  • Chattanooga State Community College.
  • Cleveland State Community College.
  • Columbia State Community College.
  • Dyersburg State Community College.
  • Jackson State Community College.
  • Motlow State Community College.
  • Nashville State Community College.

How long do you have to live in TN to be considered a resident?

Although the State of Tennessee does not have a durational requirement of 6 months or a year or more this does not mean that moving into your room, renting an apartment prior to attending, moving into a relative’s home, or any other place to live prior to the first day of school will automatically grant in-state …

What is the difference between Tn promise and hope scholarship?

TN Scholars does require 80 hours during your 4 years of high school. TN Promise requires students to complete 8 hours prior to every semester they receive Promise. The HOPE scholarship does not require community service. Do I have to complete the FAFSA?

All benefits