How does the Minuteman Scholarship work?

The Minuteman Scholarship covers full tuition and fees (uncapped) or $10,000 per year toward room and board at any college or university served by an Army (ROTC) program. … After graduation and commissioning, Minuteman Scholarship recipients are guaranteed placement in the Army Reserve.

How hard is it to get Minuteman scholarship?

The minuteman scholarship is one that is very competitive and took a lot of work on the part of the recipient. The minimum GPA that students have to have was 2.5, however at George Mason the minimum GPA was 3.5 and students had to write an essay as well.

How do you get a Minuteman scholarship?

REQUIREMENTS

  1. Be a U.S. citizen.
  2. Be accepted to a college/university with an ROTC program.
  3. Have a 2.5 cumulative GPA and maintain a 2.0.
  4. As an incoming freshman, have a minimum 19 ACT or 1000 SAT to qualify for the four-year Minuteman Scholarship.
  5. Be under 31 years of age for the entire year of commissioning.
IT IS INTERESTING:  Best answer: What grades do I need for a scholarship?

How much do SMP cadets get paid?

Advanced Course ROTC SMP students are paid for their Guard/Reserve training and receive the ROTC allowance as well as $1200.00 per year for books.

How does ROTC scholarship work?

Students can earn the ROTC scholarship in high school or in college. Students who earn the scholarship in high school receive four years of funding if they remain in the ROTC program. … In addition to the option to have tuition and fees or room and board covered, ROTC cadets also receive a living stipend.

Is it hard to get an ROTC scholarship?

At the national level, ROTC scholarships can be highly competitive, with about 2,000 Army ROTC scholarships available at the national level. The funding amount varies, and at some schools an ROTC scholarship is worth up to $80,000 for tuition and fees.

Does reserves pay for college?

As a Soldier in the Army Reserve, you can take advantage of the Montgomery GI Bill as a way to pay for your college education. Depending on how long you enlist, you can get over $13,000 to help pay for college. WHAT’S THE PAY LIKE? Up to $356 per month for 36 months for full-time students.

How long do you have to serve to get free college?

The Montgomery GI Bill extends educational benefits to any active duty member of the military who served for at least 2 years of active duty. This also extends to veterans of any branch of the military. You receive up to $1,857 each month for educational expenses, as long as you’re enrolled full-time.

IT IS INTERESTING:  Is it easy to get scholarship?

Do ROTC cadets outrank enlisted?

The Evidence: The NCO referred me to AR 600-20, Army Command Policy, which makes it pretty clear that West Point cadets do, in fact, outrank Army NCOs. This regulation shows that cadets rank after commissioned and warrant officers, but before NCOs. … You’re right, Sergeant, a West Point cadet DOES outrank you.

What is a GRFD scholarship?

The GRFD Scholarship is designed for people who have prior military service and would like to commission into either the Army National Guard or Army Reserve. These scholarships allow MOS qualified veterans to draw GI Bill benefits while simultaneously receiving scholarship benefits.

Do you salute a cadet?

No. While technically cadets outrank all enlisted personnel (AR 600–20 Army Command Policy) and service academy cadets are authorized to exercise command ahead of NCOs in the absence of all other officers, cadets do not rate salutes except amongst themselves.

Can SMP cadets be activated?

SMP cadets will NOT mobilize with their unit, but will be transferred to a non-mobilizing unit. Upon unit mobilization, the Secretary of the Army will determine if ROTC cadets (to include SMP) will be commissioned immediately or will continue in pre-commissioning training.

Do SMP cadets go to basic?

In the SMP, a cadet will participate in monthly unit training with the Reserves or National Guard one weekend a month and get paid to drill once a month with their Guard unit. Cadets do have to attend Army Basic Combat Training and join the Guard or Reserves. … You can still become commissioned as an officer in the Army.

IT IS INTERESTING:  Frequent question: Do you get a scholarship for being in NHS?

What are 3 advantages of joining the military?

An important step is understanding the many tangible and intangible benefits of joining the military:

  • A guaranteed paycheck and Cash Bonuses.
  • Education Benefits.
  • Advanced and Specialty Training.
  • 30 days annual paid vacation.
  • Travel.
  • Option for full-time or part time service.
  • Tax-free room, board and allowances.

What are my chances of getting an ROTC scholarship?

For the academic year 2018-2019, more than 7,000 high school senior applications for the scholarship were reviewed. About 3,000 applicants were awarded a scholarship. About 25% of those were 4-year scholarships and 75% were 3-year scholarships.

What rank do you get after Jrotc?

If you have two years of JROTC training, you can enter at the rank of airman (paygrade E-2). You also can enter at this level if you have 20 credits from an accredited college or university, or if you have achieved Eagle Scout or Girl Scout Gold.

All benefits