How do I get a scholarship to NAU?

What scholarships does NAU offer?

Types of scholarships available to NAU students

  • Freshman Merit-Based Tuition.
  • National Scholars Awards.
  • Flinn Scholars Awards.
  • Graduate College.
  • NAU Foundation.
  • Tribal.
  • Transfer.
  • Private Donor.

What do you need to qualify for a scholarship?

There are many scholarships with academic requirements. This means that GPA and/or test scores are the main requirement to win the scholarship. While a majority of academic scholarships require students to hold a high GPA, there are a few scholarships that award students for less-than-stellar academic performance.

How do you get a lumberjack scholarship?

Lumberjack Scholars Award

Selection: Based on the completion and/or in-progress work of the 16 college preparatory (core) courses that are required for admission and a minimum 3.5 unweighted core high school GPA, with no letter grade lower than “B” in any of the required core courses.

How much does it cost to go to NAU for 4 years?

The tuition charge is $25,270 while room and board is $10,534, books and supplies are $1,000 and other fees come in at $1,246. All price data is sourced from the 2019/2020 U.S. Department of Education National Center for Education Statistics survey.

IT IS INTERESTING:  How many Navy ROTC scholarships are given out?

How much is the lumberjack scholarship?

The Lumberjack scholarship is awarded to any Arizona resident who gets no grade lower than a B throughout high school. The scholarship is worth approximately $16,000 a year.

Is it easy to get into NAU?

The school has a 85% acceptance rate ranking it #6 in Arizona for lowest rate of acceptance. Last year, 31,248 out of 36,810 applicants were admitted making Northern Arizona University an easy school to get into with a very good chance of acceptance assuming you meet the requirements.

How hard is it to get a scholarship?

Applying for scholarships is hard, but then so is applying for college admission. It gets much easier after the first half-dozen applications, since the student can reuse and adapt previous application essays. … Apply for every scholarship for which you are eligible to increase your chances of winning a scholarship.

Can anyone get a scholarship?

You have to be a high school student to win a scholarship.

Many scholarships are for undergraduate students and those no longer in school at all. There are also scholarships for graduate students. You definitely don’t need to be in high school to qualify.

What grades do you need for a scholarship?

One of the most common grade point average requirements is a 3.0 average. (Again, every scholarship provider is different and it’s up to them to set their eligibility criteria, not us.) While some scholarships are based on a student’s GPA, most scholarship aren’t only about a student’s GPA.

Who is NAU’s rival?

Northern Arizona Lumberjacks football

Northern Arizona Lumberjacks
Conference titles 2 (1978, 2003)
Rivalries Southern Utah (rivalry)
Colors Blue and Gold
Website nauathletics.com
IT IS INTERESTING:  How hard is it to get Minuteman scholarship?

How much is NAU tuition per year?

Local tuition 11,896 USD, Domestic tuition 26,516 USD (2019 – 20)

What is an Obama scholar?

The Obama Foundation Scholars Program will give rising leaders from the United States and around the world who are already making a difference in their communities the opportunity to take their work to the next level through an immersive curriculum that brings together academic, skills-based, and hands-on learning.

Is Nau expensive?

The total tuition and living expense budget for in-state Arizona residents to go to NAU is $28,150 for the 2019/2020 academic year.

Total Costs.

Estimated Budgets
In-State Tuition $10,650
Other Fees $1,246
Room and Board $10,534
On-Campus Other Budget $4,720

How much do dorms cost at NAU?

Approved by the Arizona Board of Regents.

Residence Hall/Type 2020-2021 Rates
Freshman Halls $5,852
Honors College Single $7,800
Honors College Shared $7,080
Upper-Division

What GPA does NAU require?

You will be offered admission to Northern Arizona University if you have a 3.0 or higher core GPA (based on a 4.0 scale and calculated using only the 16 required core courses below) and have no deficiencies in those core courses.

All benefits