Best answer: How does the HOPE scholarship work in Georgia?

HOPE Scholarship is a merit-based award available to Georgia residents who have demonstrated academic achievement. … HOPE Grant is available to Georgia residents who are pursuing a certificate or diploma. A HOPE Grant recipient must maintain a minimum 2.00 cumulative postsecondary grade point average to remain eligible.

What percentage of tuition does the HOPE Scholarship pay?

Percentage for Undergraduate Bachelor’s degree students is 85.83%* of tuition for 15 hours. Actual HOPE payments will be made on a “per credit hour” enrolled basis rate of $256.00. Percentage for Undergraduate Associate degree students is 93.68%* of tuition for 15 hours.

Is the Hope Scholarship a full ride?

Amounts: The Zell Miller Scholarship pays the standard undergraduate tuition rate. The initial HOPE Scholarship award amount assumes the maximum amount for which you are eligible each semester. … The HOPE and Zell Miller Scholarship award amounts cannot exceed your total tuition charges for the semester.

IT IS INTERESTING:  Does Carnegie Mellon give National Merit Scholarships?

How do you get the HOPE scholarship in Georgia?

Eligibility for the HOPE Scholarship

  1. Meet HOPE’s U.S. citizenship or eligible non-citizen requirements;
  2. Be a legal resident of Georgia;
  3. Meet enrollment requirements;
  4. Be in compliance with Selective Service registration requirements;
  5. Meet academic achievement standards;
  6. Be in good standing on all student loans or other financial aid programs;

Will I lose my HOPE scholarship if I take a semester off?

Students who lose the HOPE scholarship at a 30, 60 or 90 hour checkpoint, or an End-of-Spring checkpoint may regain eligibility if they have a 3.0 at the point of attempting 60 or 90 semester hours. After a student has attempted 90 credits, he or she cannot be reevaluated.

What is the GPA requirement for HOPE scholarship in Georgia?

A HOPE Scholarship recipient must graduate from high school with a minimum 3.00 grade point average (as calculated by GSFC) and maintain a minimum 3.00 cumulative postsecondary grade point average to remain eligible.

How many hours do you need for the HOPE Scholarship?

Students attending private colleges and universities must be enrolled at least six (6) hours to receive an award. Students who are eligible to receive HOPE as entering freshmen may receive payment through the term during which the number of attempted (not earned) credits equal at least 30 semester or 45 quarter hours.

How much does GA HOPE Scholarship pay?

For 2020-2021, the HOPE Scholarship pays a maximum of $7,680 for two semesters of enrollment in 15 HOPE eligible credits per term. Actual payment amounts for HOPE will be pro-rated down for students enrolled in fewer than 15 eligible hours.

IT IS INTERESTING:  How can an international student get a scholarship in Canada?

How much does HOPE scholarship cover at Georgia Southern?

HOPE/Zell Miller Scholarships

Hope pays about 85% of the 2020 summer tuition rate for eligible students. Zell Miller pays 100% of summer tuition for eligible students. Students must have a 2019-2020 FAFSA or GSFAPP on file.

How do you qualify for HOPE Scholarship?

To be eligible, students must receive at least a 21 on their ACT or a 1060 on the SAT and have a 3.0 or above GPA. Students also are required to complete the FAFSA application and to enroll full-time at an eligible college within 16 months of graduating high school.

How can I go to college for free in Georgia?

Students in Georgia who meet eligibility criteria can receive tuition assistance through the state lottery-funded Helping Outstanding Pupils Educationally (HOPE) scholarship. Typically, students qualify by earning a diploma from a HOPE-eligible high school and achieving a minimum 3.0 GPA.

How do you know if you got the HOPE Scholarship?

You can access your My College HOPE Profile through your GAfutures account. … Your college will determine final eligibility based on all eligibility requirements for the HOPE Scholarship, Zell Miller Scholarship, HOPE Grant or Zell Miller Grant.

Do I have to reapply for the HOPE scholarship every year?

If you are ONLY interested in receiving the HOPE Scholarship you may complete the GSFApps at www.GAfutures.org. This is a one-time application so there is no need to reapply each year.

Why was my HOPE scholarship Cancelled?

If you fail to maintain that 3.0 GPA until the end of the semester in which you attempt your 30th credit hour, you become ineligible. … Students who lose their HOPE Scholarships for not maintaining a 3.0 average can reapply if their GPA has returned to that level after the 30th, 60th or 90th credit hour attempted.

IT IS INTERESTING:  Question: Are full ride scholarships common?

Is Hope GPA the same as institutional GPA?

The GPA used for HOPE Scholarship is a Cumulative GPA, which means that all courses ever taken towards any Degree Program after High School Graduation are counted. … In the Cumulative GPA, if a course is repeated then all attempts are counted in the GPA, while in the Institutional GPA only the higher grade is counted.

How much does hope cover at KSU?

The HOPE scholarship will pay for as many hours as a student chooses to enroll up to a maximum of 15 credit hours per semester. For eligibility criteria and specifics regarding the HOPE Program, please view GAfutures.

All benefits