Why was grant such a great general?

But taken on its own terms, Grant was an exceptional general of both theater commands, as in his seige of Vicksburg, and in command of all the Union armies when he came east. … He saved the Battle of Shiloh after the Union line was shattered on the first day, reorganizing his forces and counterattacking.

What made Grant a great general?

Grant Was One of America’s Most Brilliant Military Leaders. What he lacked in knowledge of military art and science, he made up for with tenacity and grit. In March 1864, Ulysses S. Grant went to Washington, D.C., to receive his commission from Abraham Lincoln as lieutenant-general in command of all the Union armies.

Who was the greatest general of the Civil War?

There was no requirement of a balanced list, it just shook out that way, but we’ll see if our commentariat agrees.

  1. 1 Robert E Lee (Confederacy)
  2. 2 Ulysses S Grant (Union) …
  3. 3 William T Sherman (Union) …
  4. 4 Stonewall Jackson (Confederacy) …
  5. 5 Philip Sheridan (Union) …
  6. 6 Nathan Bedford Forrest (Confederacy) …
IT IS INTERESTING:  What is Kings Grant land?

16 апр. 2015 г.

Who is considered the greatest general of all time?

Napoleon Bonaparte

After 43 battles, he has a WAR score of more than 16, which blows the competition away. There can be no question: Napoleon is the greatest tactical general of all time, and the math proves it.

What made Ulysses S Grant a good leader?

Grant was always humble. He treated his superiors with deference and respect, he always placed himself on the same level as his subordinates, and he showed honor and compassion to his enemies. In so doing, he effectively led Union forces to triumph over the Confederacy, and won the Civil War.

Who was the worst general in the Civil War?

The Ten Worst Generals of the Civil War

  • John B. …
  • John B. …
  • Ben F. …
  • Leonidas (Bishop) Polk (1806–1864) …
  • Joseph Hooker (1814–1879) …
  • John Pope (1822–1892) Like many other officers in the Union Army in the Eastern Theater, John Pope was given one chance to be a great General. …
  • P.G.T. Beauregard (1818–1893) Pierre G.T. …
  • George B. McClellan (1826–1885): Honorable Mention.

What kind of president was Grant?

Grant is best known as the Union general who led the United States to victory over the Confederate States of America during the American Civil War. As a two-term President, he is typically dismissed as weak and ineffective; historians have often ranked Grant’s presidency near the bottom in American history.

Who was the South’s greatest general?

The most famous of them is General Thomas “Stonewall” Jackson, probably the best known Confederate commander after General Robert E. Lee.

IT IS INTERESTING:  Quick Answer: What can Pell grant money be spent on?

How many died in Civil War USA?

For more than a century, it has been accepted with a grain of salt that about 620,000 Americans died in the conflict, with more than half of those dying off the battlefield from disease or festering wounds. All along, however, historians sensed that number underrepresented the death toll.

Which was the bloodiest battle of the Civil War?

Antietam was the bloodiest one-day battle of the Civil War.

Who is the only 6 star general in American history?

George Washington, History’s Only Six-Star General ( … Sort Of) | Mental Floss.

Who is the greatest warrior ever?

Alexander the Great is arguably the greatest warrior of all time. He was the King of Macedon between 336 BC and 323 BC. His empire spread from Greece to India, conquering Persia, Syria, the Balkans, Egypt and many other regions.

Who was Hitler’s best general?

648 pp. 16 color maps. Weidenfeld & Nicolson, 2010. No major biography of Field Marshal Erich von Manstein has appeared in English until now, though he was the greatest German general of World War II—and probably the greatest of all the war’s leaders.

Who was better Grant or Lee?

Grant was the better general overall. Lee would have been an outstanding Corp commander, but he lacked the strategic ability so necessary for one in his position. To put it another way, Lee knew how to win battles, but Grant knew how to win the war. Lee’s aggressive strategy came at a terrible cost for the South.

Who opposed grant in 1872 presidential election?

Despite a split in the Republican Party, incumbent President Ulysses S. Grant defeated Liberal Republican nominee Horace Greeley. The election is notable for being the only presidential election in which a major party nominee died during the election process.

IT IS INTERESTING:  Your question: Can you get both State University Grant and Cal Grant?

Which two actions of President Grant suggest that he was corrupt?

He was involved in the Crédit Mobilier scandal. He appointed wealthy people who had donated money for his political campaign to federal offices. He wanted to enforce Reconstruction in the South despite Southern resistance.

All benefits