Why did Grant adopt the total war strategy?

Answer Expert Verified. Although he was against it at first, he understood that with a total war strategy, they could completely destroy any military resources that the enemy might use and this would prevent them from waging war since they wouldn’t have resources.

Why did General Grant and Sherman use a total war strategy?

Answer: Grant and Sherman used the strategy of total war to shorten the war in their favor, using the many deaths of enemies to save live on their side. We way never know if more would have died if they didn’t use the tactic, but in my opinion civilian lives were not theirs to take.

What was Grant’s strategy for winning the war?

The Union strategy to win the war did not emerge all at once. By 1863, however, the Northern military plan consisted of five major goals: Fully blockade all Southern coasts. This strategy, known as the Anaconda Plan, would eliminate the possibility of Confederate help from abroad.

IT IS INTERESTING:  Are there grants for small business?

What did grant mean by total war?

Grant meant by the term “total war.” Total war was war on the enemy’s will to fight and its ability to support an army.

How did Ulysses S Grant’s concept of total war differ from earlier battle strategies?

How did Ulysses S. Grant’s concept of total war differ from earlier strategies? Civilians were subject to the same hardships as enemy soldiers. What plan did Grant have for ending the war?

Who was a better general Grant or Sherman?

Grant was the greater general. Sherman had the more brilliant intellect but it is probably why he could see so many problems. Grant’s mind was simpler – he could see a battle or strategic problem and cut to the chase of what was required.

Did defeating the Confederacy justify harming civilians?

Do you think the end- defeating the Confederacy- justified the means- causing harm to civilians? Sherman thought the total war method would be the only way to winning the war. … From these actions he started hurting civilians.

What were the three parts of the union’s strategy to win the war?

Based on this strategic environment, General Winfield Scott developed an initial plan which consisted of three steps: 1) the blockade of the Southern seaports; 2) the control of the Mississippi River; and 3) the capture of Richmond, Virginia, the capital of the Confederacy.

Did Grant win the Civil War?

In 1865, as commanding general, Ulysses S. Grant led the Union Armies to victory over the Confederacy in the American Civil War. As an American hero, Grant was later elected the 18th President of the United States (1869–1877), working to implement Congressional Reconstruction and to remove the vestiges of slavery.

IT IS INTERESTING:  What grants should I apply for?

What was Grant’s strategy to defeat the Confederacy?

Grant wanted to defeat the confederacy and force them to unconditionally surrender. He wanted to slowly wear down the southern troops and slowly have them use all of their supplies.

What general won the Civil War?

Ulysses S. Grant was the most acclaimed Union general during the American Civil War and was twice elected President.

Did Grant fight at Gettysburg?

Though the great Confederate general would go on to win other victories, the Battle of Gettysburg (combined with Ulysses S. Grant’s victory at Vicksburg, also on July 4) irrevocably turned the tide of the Civil War in the Union’s favor.

Who did General Grant replace?

He was admitted to West Point and graduated 21st in the class of 1843. Grant served with distinction in the Mexican–American War.

Ulysses S. Grant
In office March 9, 1864 – March 4, 1869
President Abraham Lincoln Andrew Johnson
Preceded by Henry W. Halleck
Succeeded by William Tecumseh Sherman

What does the map illustrate about the Confederate defense?

The map illustrates how Union forces overwhelmed confederate defenses and continued their march. Explanation: … As the map shows, the Union forces overwhelmed confederate defenses as they continued their march towards Vicksburg, defeating the Confederate in all the occasions they met through the Mississippi river area.

What was the impact of total war and Sherman’s March to the Sea?

The operation broke the back of the Confederacy and helped lead to its eventual surrender. Sherman’s decision to operate deep within enemy territory and without supply lines is considered to be one of the major campaigns of the war, and is considered by some historians to be an early example of modern total war.

IT IS INTERESTING:  Best answer: Can you get more than one Cal Grant?

Why was the wilderness such a difficult place to do battle?

Why was the Wilderness such a difficult place to do battle? Thick underbrush blanketed the entire area, making gunfire nearly useless.

All benefits