Who ran against President Grant?

Who opposed grant in 1872 presidential election?

Despite a split in the Republican Party, incumbent President Ulysses S. Grant defeated Liberal Republican nominee Horace Greeley. The election is notable for being the only presidential election in which a major party nominee died during the election process.

Who were the candidates in the 1868 presidential election?

In the presidential election, Republican General Ulysses S. Grant defeated Democratic former governor Horatio Seymour of New York. Incumbent President Andrew Johnson sought the 1868 Democratic nomination, but Seymour took the nomination after twenty two ballots.

Who ran against Barack Obama in 08?

2008 United States presidential election

Nominee Barack Obama John McCain
Party Democratic Republican
Home state Illinois Arizona
Running mate Joe Biden Sarah Palin
Electoral vote 365 173

Who ran for president in 1870?

The 1870 United States elections occurred in the middle of Republican President Ulysses S. Grant’s first term, during the Third Party System. Members of the 42nd United States Congress were chosen in this election.

What happens if an elected president dies before taking office?

The rules of both major parties stipulate that if the apparent winner dies under such circumstances and his or her running mate is still able to assume the presidency, then the running mate is to become the President-elect with the electors being directed to vote for the former Vice Presidential nominee for President.

IT IS INTERESTING:  Why did I only receive half of my Pell Grant?

What is the event during 1872?

U.S. presidential election, 1872: Ulysses S. Grant defeats Horace Greeley. Women’s suffrage: In defiance of the law, American suffragist Susan B. Anthony votes for the first time (on November 18 she is served an arrest warrant, and in the subsequent trial is fined $100, which she never pays).

Who ran for president in 1866?

Johnson had become president on April 15, 1865, upon the death of his predecessor, Abraham Lincoln. Members of the 40th United States Congress were chosen in this election.

1866 United States elections.

Incumbent president Andrew Johnson (Independent)
Next Congress 40th
Senate elections
Overall control Republican hold
Seats contested 25 of 66 seats

What happened in the US in 1868?

April 29 – After pursuing a policy of total war on the Plain Indians, General William Tecumseh Sherman brokers the Treaty of Fort Laramie (1868). May 9 – The city of Reno, Nevada is founded. May 16 and 26 – President Andrew Johnson is acquitted during his impeachment trial, by one vote in the United States Senate.

Who became president in 1869?

In 1865, as commanding general, Ulysses S. Grant led the Union Armies to victory over the Confederacy in the American Civil War. As an American hero, Grant was later elected the 18th President of the United States (1869–1877), working to implement Congressional Reconstruction and to remove the vestiges of slavery.

Who ran with Obama?

2012 United States presidential election

Nominee Barack Obama Mitt Romney
Party Democratic Republican
Home state Illinois Massachusetts
Running mate Joe Biden Paul Ryan
Electoral vote 332 206
IT IS INTERESTING:  How do you write a successful grant application?

Who ran for president in 2004?

2004 United States presidential election

Nominee George W. Bush John Kerry
Party Republican Democratic
Home state Texas Massachusetts
Running mate Dick Cheney John Edwards
Electoral vote 286 251

Who was elected president in 1872?

Presidential Election of 1872: A Resource Guide

Political Party Presidential Nominee Electoral College
Republican Ulysses S. Grant 286
Democratic Horace Greeley 0*

How long was grant President?

March 4, 1869 – March 4, 1877

All benefits